St. Joseph Hospital Critical Care Towers

St. Joseph Hospital Critical Care Tower, Ann Arbor, Michigan – 3500 Tons

Douglas Steel Fabricating Corporation fabricated and erected 3,500 tons of structural steel and stairs for the new Critical Care Tower at St. Joseph’s Ann Arbor campus. Douglas Steel worked closely with the Christman Company on the 11-story structure. The steel was erected with a tower crane on an extremely tight site between existing wings of the hospital. Douglas Steel was responsible for structural and miscellaneous steel, metal deck and stairs. This addition will add significantly to St. Joseph Mercy Hospital’s presence in the greater Ann Arbor area.

This project was designed by Trinty Design and Ehlert Bryan.

St. Joseph Hospital Critical Care Tower 3B, Ann Arbor, MI – 1560 Tons

St Joseph Hospital is building this 7-story critical care tower to adjoin their recently completed 11-story tower. Douglas Steel fabricated and erected both towers totaling 5,060 tons of structural steel. The new tower adds 240,000 sf to the multi-tower complex. Christman Construction was the project manager.