Michigan State University TB Simon Power Plant Expansion

East Lansing, Michigan – 550 Tons

The project is an addition to the existing power plant on the west side of campus. Working under the construction management of Chrisman Construction, Douglas Steel Fabricating Corporation fabricated and erected 550 tons of structural steel and miscellaneous iron for the powerhouse. The project required SP-6 surface preparation and zinc prime paint. Temporary protection of the plant was required as we penetrated the existing brick and masonry for our tie-ins points. We coordinated closely with the manufacturer when hoisting the deaerator.