Lansing Board of Water & Light – REO Town Power Plant

Lansing, Michigan – 2,150 Tons

The Christman Company retained Douglas Steel Fabricating Corporation to provide engineering support, fabrication and erection for this complex 154,000 sq.ft. project.  Working with an extremely tight site, numerous design revisions took place during the shop drawing preparation and fabrication phase.  Douglas provided space in our office for the EOR to come in and review the 3D model and approve the shop drawings on the spot, which streamlined the entire shop drawing review process.  Our in-house engineering and fabrication capabilities enabled us to offer alternate framing and connection solutions, react to numerous design changes, and complete the project on schedule.